Blue Offshore's loading tower and tensioner were upgraded for heavier products with a larger diameter. The loading tower was also made higher and stronger. Stairs and walkways were improved to have easy access to the complete loading tower during operation.
Bright Engineering was responsible for the complete detail engineering including all the (FE) calculations, reports, CAD models, and fabrication drawings.