90DR Calculations

Bright Engineering made extensive strength calculations of the WPD-90DR piling rig. 

After determining the governing load cases, FE and analytical calculations were done to prove the suitability of the rig under all circumstances allowed in the capacity booklet. 

All the parts, welds, and bolted connections of the WPD-90DR piling rig were checked for the governing load cases. 

 

Year: 2018

Client: Woltman Piling & Drilling Rigs B.V.